PROJECT EXAMPLE · JOINT REMOVAL

Example project · 80 m² façade prepared professionally for new pointing

This example covers approximately 80 m² of existing, weathered joints being inspected, carefully removed and prepared for a new finish. It demonstrates how we organise, protect, execute and hand over a façade project professionally.

Professional removal of old masonry joints
01

Professional removal of old masonry joints

This example covers approximately 80 m² of existing, weathered joints being inspected, carefully removed and prepared for a new finish. It demonstrates how we organise, protect, execute and hand over a façade project professionally.

80 m²example façade
3–5 working daysindicative schedule
± 2 cmguide depth, depending on the façade
02

Step by step · how the project is executed

01

Inspection & measurement

We measure the façade, inspect the bricks and joints, assess access and identify areas requiring extra care.

02

Protection & setup

Windows, frames, paving and surrounding areas are protected. Work zones are set up with dust control, waste handling and safe access.

03

Raking out / removing joints

Existing mortar is carefully removed to a sound base. The method is selected according to brick type, façade age and condition.

04

Cleaning & inspection

Loose material is removed, joints are brushed clean and the masonry is checked for damage or areas requiring repair.

05

Waste removal & preparation

Old mortar and debris are collected and disposed of. The façade is left clean and ready for the new pointing system.

06

Final inspection & handover

We check depth, consistency, connections and cleanliness and discuss any next steps such as repointing or local brick repairs.

03

Indicative schedule · several working days

Day 1Inspection, protection, access & setting out
Day 2Joint removal – first façade areas
Day 3Joint removal – remaining areas
Day 4Cleaning, inspection & minor preparation
Day 5Waste removal, final check & handover
04

Work & material schedule · example 80 m²

Item Specification Quantity Note
Dust-controlled toolsjoint cutter / chiselling tools with extractionapprox. 80 m²final method after inspection
Protection materialswindows, frames and access zones1 projectdepends on site
Waste disposalmasonry / construction wasteapprox. 1.5–2.5 m³actual quantity after work
Access equipmentscaffold / mobile tower where required1 projectheight and access dependent
Cleaning & preparationbrushing / dust removal80 m²ready for new pointing
05

Example budget · 80 m²

Indicative selling price for a professional multi-day project. The budget includes labour, materials, protection, disposal, organisation and an operating/risk reserve so the project remains commercially responsible.

Work itemExcl. btwIncl. btw
Inspection, measurement & preparation€ 450.00€ 544.50
Protection & site setup€ 950.00€ 1,149.50
Joint removal 80 m²€ 2,100.00€ 2,541.00
Cleaning & façade preparation€ 450.00€ 544.50
Waste, small tools & transport€ 300.00€ 363.00
Indicative total including 21% Dutch VAT€ 5,142.50

2026 market comparison · international reference

Dutch market guides indicate roughly €25–€45 per m² for joint removal/raking out depending on method and conditions. Belgian guides quote about €33–€42 per m² for removing joints. German sources show broader masonry joint ranges around €35–€80 per m², while UK guidance lists roughly £20–£50 per m² for raking out. These are market references, not direct quotations; access, scaffolding, façade type and waste disposal can change the price materially.

Important · example price, not a fixed quotation

This is an example project. The final price may change due to actual façade dimensions, joint depth, brick condition, height, access, scaffolding, disposal, weather and additional repairs. Material and supplier prices can also change. We issue a final quotation after assessing the property. The budget includes an operating and risk reserve, but a specific profit margin is never guaranteed because actual costs can differ.

Request a quotation →